Liftways in buildings
The building regulations set out legal requirements for specific aspects of building design and construction. A series of approved documents provide general guidance about how different aspects of building design and construction can comply with the building regulations.
Approved document M provides guidance for satisfying Part M of the building regulations: Access to and use of buildings, which requires the inclusive provision of ease of access to, and circulation within, buildings, together with requirements for facilities for people with disabilities.
Approved document M, Volume 1: Dwellings (2015 edition incorporating 2016 amendments) defines a liftway as a:
Vertical route linking all floors of a dwelling accommodating (or capable of accommodating) a lift or lifting platform. |
In wheelchair accessible and wheelchair adaptable dwellings, the approved document may require the installation of a liftway 1100mm wide and 1650 mm long internally, linking circulation areas at every floor level of the dwelling. However, in wheelchair adaptable dwellings it may permit the liftway to be used for another purpose (such as storage) providing that it would be easy to convert the liftway to use without the need for structural modifications and without compromising other requirements of the regulations.
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
- Accessibility in the built environment.
- Approved document M.
- Disabled access lifts.
- Equality Act.
- Firefighting lift.
- Hoists.
- Lift Standards: EN 81-20 and EN 81-50.
- Lifts.
- Lifting device.
- Lifting Operations and Lifting Equipment Regulations (LOLER).
- Lifting platform.
- People with disabilities.
- Ramps.
- Wheelchair platform stairlifts.
Featured articles and news
Getting the most out of heat pumps and heating
How heat pumps work and how they work best.
Plumbing and heating for successful retrofit and renovation
Low temperature underfloor systems and heat pumps.
Cost-of-living crisis and home improvement plans
Starting on the right footing and top tips for projects.
Delays on construction projects
Types, mitigation and the acceleration of works.
From Chaucer to Fawlty Towers.
Electrotechnical excellence, now open for entries.
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.
New project and cultural district described in detail.
The nature of EPCs, crticism and inaccuracies.
History, issues and redesign.
From waste recycling to energy performance the hierchy.
An introduction to WERCS and WEEE responsibilities
Dealing with 2 million tonnes of waste equipment a year.
Global BACS Market: analytics and optimisation
A BSRIA glance at building automation and control systems.
What it is and how to use it.
Types of insulating plaster by binder and insulant.
Investors in People: CIOB achieves gold
Reflecting a commitment to employees and members.
Scratching beneath the surface; a guide to selection.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.
UK gov apprenticeship funding from April 2024
Brief summary the policy paper updated in March.